Java程序辅导

C C++ Java Python Processing编程在线培训 程序编写 软件开发 视频讲解

客服在线QQ:2653320439 微信:ittutor Email:itutor@qq.com
wx: cjtutor
QQ: 2653320439
Cable sockets - Sydney Harbour Bridge Skip to content New South Wales Government Sydney Harbour Bridge index | news Home Building The Bridge Engineering Studies Engineering Mechanics Engineering Hydraulics Engineering Materials Concrete Steel structure Corrosion Cable sockets Rivets Testing Engineering Surveying Professional Issues Web resources for teachers and students Syllabus support Home Engineering Studies Engineering Materials Cable sockets Cable sockets During the construction of the bridge, each half arch was built out from each shore supported on each of the main bearings. As the main bearings are designed to allow a small amount of rotation (to take up changes in loads, and expansion and contraction due to temperature change) each half-arch had to be supported in some way to prevent it from falling into the harbour. This support was provided using cables mounted to 'link plates' near the top of the half arch and passing through 'U' shaped tunnels underground. One hundred and twenty-eight cables were fixed to the south-eastern top chord of the arch. They passed through the tunnel and terminated on the south-western top chord. A similar arrangement was used on the north shore. To be able to control the position of the arch, the lengths of the cables had to be adjustable. This was particularly necessary when the two half-arches were lowered to enable them to be joined together. To allow for length adjustment (to raise and/or lower each half arch), each cable was fixed into a steel socket. The following images show how this was done at both ends of each cable. Socketing Operations. Fixing the end of a cable into a steel socket. The first image shows the 217 wires of a single cable separated out. The second image shows the wires have all been squeezed into the socket, and are being heated with a blowtorch. Source: Parables of the Sydney Harbour Bridge by Frank Cash, 1930, p 257. Socketing Operations. The socket is filled flush to the top with molten white metal, making the cable and the socket one mass. The finished socket is ready for attachment to the link plates. Source: Parables of the Sydney Harbour Bridge by Frank Cash, 1930, p 259. The process was somewhat like a soldering process. Each cable was threaded through a prepared steel socket (there were 512 sockets in total). The individual strands of each cable (217 in each cable) were splayed out, cleaned and folded back onto themselves. The cable was pulled back until the wires were tightly fixed into the tapered hole in the socket. After this process the socket was heated. Molten ‘white metal’ was poured into the socket. (White metal is a general name for low melting point alloys, typically of lead and tin.) The result is that the molten white metal reacted with the hot steel wires and socket to form an intermediate alloy in the same way that electrical solder alloys with the electrical wire to form strong joints. When finished, the steel socket was ready for attachment to the link plates. A steel saddle and tag. In the top image, the cables are supported by the steel saddle which is fixed to the rear wall of the pylons. The tag is the identity disc attached to each cable. Source: Parables of the Sydney Harbour Bridge by Frank Cash, 1930, p 289.   NSW Government | jobs nsw Sitemap | Privacy | Copyright | Feedback | Site help | Last updated 07 August 2014